mJob

Industry: Heavy Civil & Engineering
Engineering Success Story
JPC Group Streamlines Project Management with Construction Management Software

Discover how Philadelphia's leading engineering firm eliminated manual data entry for 200+ employees using our robust construction management software.

JPC Group Project Management
200+ Employees Tracked
100% Digital Field Reporting
75+ Heavy Equipment Units

The Construction Management Software Challenge

Founded in 1954, JPC Group, Inc. has evolved into a powerhouse engineering and demolition firm. However, they were still relying on a "cumbersome paper system" to track field labor. Manual re-entry of timesheets into their accounting system was causing significant delays. They needed a faster, more accurate way to bridge the gap between the field and the office without adding complexity for their foremen.

"With over 200 employees and 75 to 100 pieces of heavy equipment to bill and cost to multiple jobs in our accounting system, mJob has been an incredible timesaver."
— Ken Rizzo, JPC Systems Manager

A Bird's Eye View of Project Management

JPC Group realized that mJobTime provided much more than just simple time tracking. It became a comprehensive construction management software tool that allowed them to track every detail of a project site in real-time:

  • Material Tracking: Foremen log deliveries, ticket numbers, and yards of concrete directly in the field.
  • Subcontractor Oversight: Management can see exactly which subs are on-site at any given moment.
  • Equipment Billing: Simplifies the complex process of costing heavy machinery across multiple job sites.
  • Accounting Flexibility: Seamlessly integrates with multiple accounting packages, retaining historical records during system migrations.

The Result: Dramatic Efficiency

The transition to digital documentation has given JPC management a "bird’s eye view" of their operations. Field supervisors now spend more time on actual construction and less on administrative paperwork. The office staff, once burdened by manual entry, is now better equipped to handle a heavy workload with 100% accuracy in their labor and material reporting.

Comments are closed.